Skip to main content
Fig. 4 | Progress in Earth and Planetary Science

Fig. 4

From: Ensemble flash flood predictions using a high-resolution nationwide distributed rainfall-runoff model: case study of the heavy rain event of July 2018 and Typhoon Hagibis in 2019

Fig. 4

Peak runoff by ensemble forecasting (lines) and the simulation (dots) at all the dam reservoirs for F18. The x-axis shows the 21 ensemble members in descending order of forecasted peak runoff shown on the y-axis. Note that the flood peaks were evaluated after 16:00 6 July 2018 to exclude the effects of first flood peaks, which occurred at some dam reservoirs nearly at the same time as the MEPS initial time for F18

Back to article page