Fig. 3From: Ensemble flash flood predictions using a high-resolution nationwide distributed rainfall-runoff model: case study of the heavy rain event of July 2018 and Typhoon Hagibis in 2019Observed and simulated hydrographs at dam reservoirs for T19 (calibrated case). The “radar” shows the simulated hydrographs, and “MEPS” shows the forecasted results initialized at 9:00 on 11 October 2019 by 21 ensemble members. These dams are positioned in the Kanto RegionBack to article page