Fig. 1From: Two decades of Earth system modeling with an emphasis on Model for Interdisciplinary Research on Climate (MIROC)Structure of the original version of the Earth system model (ESM) used for the Coupled Model Intercomparison Project (CMIP) Phase 3, developed by Team MIROC. From CMIP Phase 5 onwards, the full atmospheric chemistry component model CHASER was added. The land biogeochemical model was later replaced by SEIB-DGVM for CMIP Phase 5 and then by VISIT for CMIP Phase 6. All model acronyms are listed in the AbbreviationsBack to article page