J-Calibration | SBE-Calibration | |
---|---|---|
Artificial seawater | Flowing directly from the tank to sensors through tubes | Filling water in a big tank, put sensors into filling water. |
Amount of seawater per one experiment | 10 L | 230 L |
Maintaining seawater temperature | Spot insulation of sensors and a part of tubes with insulating material and housing. | Tank surrounded by adiabatic material, controlling water automatically with a tiller. |
Removing CTD unit | Not necessary. | Necessary with special skills. |
Controlling system | Sending command to sensors and standard sensor by laptop computers. | Using a special computer unit manufactured by SBE. |