From: Greenhouse gases Observing SATellite 2 (GOSAT-2): mission overview
Onboard calibration | SWIR | TIR | Purpose, frequency | |||
---|---|---|---|---|---|---|
B1 | B2 | B3 | B4 | B5 | ||
ILS laser sphere | X | X | Â | Â | Â | ILS stability because the PFT (once per 6Â days) |
Solar diffusers (both sides) | X | X | X | Â | Â | Radiometric response degradation (one side per orbit, the other side per 3Â months) |
Lunar calibration (Park to target) | X | X | X |  |  | Radiometric response degradation (per month, + 7° waning near Full Moon) |
Deep space | Â | Â | Â | X | X | TIR onboard radiometric calibration (2 times in dayside, four times in nightside orbit) |
Blackbody | Â | Â | Â | X | X | TIR onboard radiometric calibration (2 times in dayside, four times in nightside orbit) |
Phase transition cell | Â | Â | Â | X | X | Blackbody thermometer verification (if necessary) |
FOV camera | Â | Â | Â | Â | Â | FOV confirmation (2 times per sounding in dayside orbit) |