Fig. 4From: Ground motion hazard of the China–Pakistan Economic Corridor (CPEC) routes in PakistanCompleteness periods obtained through regression analysis using the Tinti and Mulargia (1985) method for CPEC routes in Pakistan by considering the moment magnitude range of 0.5 units above the minimum threshold moment magnitude of 4.0Back to article page